Herkimer Elementary School
• Replace Two Windows in Each Classroom of the A & B Wings
• Replace Remaining Windows in A and B Wings
• Improve Air Circulation/PRV
• Replace Existing Unit Ventilators (50 Rooms)
• Replace Roof & Skylights
• Add Ansul Fire Suppression Gas Shut Off Valve for Kitchen Hood
• Add Emergency Lighting & Generator (150KW) - Pumps, Security, Boilers, Phone, Kitchen Coolers & Freezers
• Add Security System (Cameras at Entrances, Corridors)
• Add Keyless Entrance System / Buzzer System for Front Entrance (One Door)
• Upgrade Existing Phone System
• Provide New PA System
• Replace Pump at Leech Field
• Reconstruct and Enclose Entry Canopy
• Provide Emergency Lighting, & Security System for Parking Lots & Athletic Fields (Cameras)
• Repair Septic System
• Provide Air Conditioning/Ventilation for Assistant Principal's Office
• Provide Air Conditioning/Ventilation for B20 & B21 Including Windows
• Provide Air Conditioning for Copy Room
• Provide Air Conditioning for Cafetorium
• Replace Carpet in Library (Inc. Assistant Principal's Office)
• Replace Carpet in Main Offices
• Provide Carpet for Conference Room (Rm 142)
• Replace Ceiling Tile & Grid in Corridors
• Add DDC Controls for Gym
• Provide Wireless Internet (10 Wireless Access Ports)
• Replace Front Entrance Sidewalks/Curbs
• Improve Drainage at Soccer Field
• Replace Curbs at Pine Grove Road Entrance For Right Turn Only out of Entrance, Add Sign
• Additional site work for Traffic Control at Pine Grove Entrance
• Two (2) New Marquees - one (1) at Athletic Complex, one (1) at Rear Entrance
• Special Ed. Conference Room / Office Addition
• Paint Door Frames
• Add Canopy at A Wing
• Replace Playscape (1) & Make Handicapped Accessible